Student CenterNoState
Teacher CenterNoState
GLENCOE.com Home > OLC
Online Learning Center
Trade & Industrial Education

Quiz 6: Math


1

The DOE facility at Oak Ridge used its Air Emission Management System to calculate how its emissions affected the . Hint
2

Using a just-in-time system of production required Coca-Cola operators to be able to estimate the quantity of needed to avoid excess inventory or shortages. Hint
3

To ensure that a part meets customer specifications, an operator or technician must the dimensions and verify that they are within the allowed margins. Hint
4

The U.S. Army's Industrial Operations Command center analyzed data based on current to develop standards for the amount of labor a process required. Hint
5

Quality assurance of critical parts, such as the UH-60 spindle assembly at CCAD, required careful measurement of the product against a . Hint
6

The laser-induced breakdown spectroscopy system (LIBS) was developed by the Applied Research Laboratory to measure the content of lead and other metals in removed from ships and scrap items. Hint
7

Proper maintenance of rotating equipment relies on measuring the of the rotating part to confirm that it is operating within specified tolerances. Hint
8

To increase productivity, Nascote Industries developed a team to measure and improve the time, or the average time needed to assemble its product. Hint
9

The Watervliet Arsenal used a laser to measure and calculate the straightness of gun tubes, ensuring that the boring tools complied with . Hint
10

The safety department at the Rock Island Arsenal analyzed workplace safety by calculating rates against production quantities. Hint
11

To remain competitive, Thermacore developed a system to calculate and reduce rates and minimize waste of materials. Hint

Log In

The resource you requested requires you to enter a username and password below:

Username:
Password: